More and more tiles are added
|
 |
 |
The carpet is laid

|
|
Kitchen appliances start to be fitted and the laundry tub is conected
 |
 |
 |
The en-suite |
 |
 |
At last, the sewage system goes in and the water tank is buried.
The pipes are laid and buried. |
 |
 |
 |

The kitchen appliances are all installed.
Ann's wardrobe is installed |
 |
 |
Finally the log fire is in.
The final jobs are outside with the laying of the driveway, putting up the fencing and sorting out the garden. |
| Since the house was finished we have added a concrete pad in front of the garage, and a second garage for Peter's ute |