We have a Front Door!!!!
More of the windows and doors are fitted
The bricks start to go on
The gaps in the frames are filled with Pink Batts (insulation).
The brickwork is nearly complete and the interior fittings have started to arrive.
The window sills are done
The Gib board starts to go up
Bathroom fittings start to be installed
Downpipes added
Internal doors are fitted.
Continued on
page 5
.
Click
on the rabbit to go to the next
page