The roof joists go on

The walls are lined

The roof goes on and the electric cables are installed

The guttering goes on and the pre-wiring for the alarm

Even the local wildlife have taken an interest
Now the work can start on the inside with the plumbers running all of the pipes for the showers, sinks, toilets, bath, kitchen and air conditioning.

The window openings are made ready for the frames.



The windows start to be fitted

The water tank arrives


Continued on page 4.